The purpose of this project is to provide a larger truck loading platform to improve logistical issues and create more efficient load-in parking capabilities. HCL provided structural and civil design […]
The purpose of this project is to provide a larger truck loading platform to improve logistical issues and create more efficient load-in parking capabilities. HCL provided structural and civil design […]
HCL was the prime consultant for the design, bid, and construction administration phases for the site and the 5,600 SF new pre-engineered metal building. The design challenge for this facility […]
The 5-story 154,000 square-foot structural steel building will house full-motion flight simulators, fixed training devices, computer rooms, offices, classrooms, and a fourth-floor exterior employee lounge. To accommodate the 40 ft tall […]
HCL was a sub-consultant to Michael Baker International. The CDOT Project involved designating and locating utilities on the south side of E Arapahoe Road that would be impacted by the […]
HCL was the prime consultant on an on-call contract for Colorado State University. HCL was tasked with assisting CSU with design surveys, Land Survey Plats, underground utility locates, aerial surveys […]
HCL was tasked with working with HNTB for the design survey on Concourses A and B West. HCL conducted a highly accurate survey that included concrete panel joints, above-ground planimetric […]
HCL was a sub-consultant to Parsons. HCL was tasked with providing the initial design survey for Colfax Boulevard from Broadway to Yosemite and two blocks north and south of Colfax. […]
HCL was a sub-consultant to Atkins Global. HCL was tasked with providing additional design surveys to assist the design team in the development of engineering plans. HCL was tasked with […]