Uvalda Tributary Channel

  • Client: Muller Engineering
  • Owner: Mile High Flood District
  • Purpose: The project was for the Mile High Flood District Channel Improvement Project to improve drainage and infrastructure in the area.
  • HCL Discipline: SUE, Survey

Uvalda Tributary Channel

HCL was a sub-consultant to Muller.  HCL was tasked to perform a multi-faceted scope for the Mile High Flood District Channel Improvement project which runs along Uvalda Street from Maxwell […]

HCL was a sub-consultant to Muller.  HCL was tasked to perform a multi-faceted scope for the Mile High Flood District Channel Improvement project which runs along Uvalda Street from Maxwell Place at the south end to E 56th Avenue on the north side and beyond into the Rocky Mountain National Wildlife Refuge. The project required utility designation, utility locates, and survey services to be performed in phases as the original scope was expanded. Additional survey and utility information was required to verify the drainage design. Test holes were required to verify various utility crossing elevations and storm sewer pipes draining to the redesigned channel. Additional efforts were required to coordinate with the concurrent reconstruction and widening of the E 56th Avenue Road improvements project.




Project Highlights