Orchard Road Trail

  • Client: Orchard Road Trail
  • Purpose: This half mile trail connection is critical to the City of Centennial trail system - it connects Palos Verdes Park to the intersection of Quebec and Orchard
  • HCL Discipline: Civil Engineering

Orchard Road Trail

HCL provided site design for new trail segments that connected segments of an existing trail. The design included trail alignment and grading, retaining wall, utility identification, and relocations, detailed trail […]

HCL provided site design for new trail segments that connected segments of an existing trail. The design included trail alignment and grading, retaining wall, utility identification, and relocations, detailed trail connections to existing trails and streets, entrance drive redesign, drainage, and erosion and sediment controls. This design was coordinated in conjunction with another firm designing a separate segment of the trail. The site was designed in accordance with the City of Centennial and Southeast Metro Stormwater Authority standards and criteria.

Project Highlights

img
img
img
href="http://www.fire-directory.com/">Fire Directory.com