DEN Concourse Expansion

  • Client: HNTB for Design
    Turner Flatiron Joint Venture
    Construction for Concourses A West and B West
    Holder FCI Joint Venture - Construction for Concourses B East and C East
  • Owner: Denver International Airport
  • Purpose: DEN built 39 new concourse gates, increasing overall capacity at the airport by 30% - New gates on all three concourses allow DEN to accommodate new airlines, including international carriers
  • HCL Discipline: Survey, Civil Engineering, Structural Engineering

DEN Concourse Expansion

HCL was tasked with working with HNTB for the design survey on Concourses A and B West.  HCL conducted a highly accurate survey that included concrete panel joints, above-ground planimetric […]

HCL was tasked with working with HNTB for the design survey on Concourses A and B West.  HCL conducted a highly accurate survey that included concrete panel joints, above-ground planimetric features, a 3D laser scan of the existing building at ground level and inside of the basement.  HCL also provided an underground utility survey that accounted for all utilities within the project limits. 

HCL was contracted by Turner Flatiron Joint Venture to provide construction staking and staking quality control on the West concourses.  HCL was also contracted by Holder FCI Joint Venture to provide construction surveying on the East Concourses.

Project Highlights

img
img
img