Purpose: This half mile trail connection is critical to the City of Centennial trail system - it connects Palos Verdes Park to the intersection of Quebec and Orchard
HCL Discipline: Civil Engineering
Orchard Road Trail
HCL provided site design for new trail segments that connected segments of an existing trail. The design included trail alignment and grading, retaining wall, utility identification, and relocations, detailed trail […]
HCL provided site design for new trail segments that connected segments of an existing trail. The design included trail alignment and grading, retaining wall, utility identification, and relocations, detailed trail connections to existing trails and streets, entrance drive redesign, drainage, and erosion and sediment controls. This design was coordinated in conjunction with another firm designing a separate segment of the trail. The site was designed in accordance with the City of Centennial and Southeast Metro Stormwater Authority standards and criteria.
Project Highlights
trail alignment and grading
retaining wall, utility identification, and relocations
detailed trail connections to existing trails and streets with entrance drive redesign